The increasingly rapid increase in demand for the security industry, continue to enter the new security ring will inevitably encounter all kinds of fortress in the early fumble, Weide Kang technology will be summed up in recent years, construction skills to share with you.

Installation works in the video surveillance systems and burglar alarms, access control time and attendance system is now new people are generally the most easily accessible to most people read, or heard a friend introduction, will that threshold is not high, it is not true. Any one industry are difficult, the difficulty is doing fine!

The early intention to customers how to negotiate the system of tenders to do, monitor the price positioning of products in here, we only mention, not a detailed explanation. Us for our theme: usually professional security systems project manager, the process of negotiating the first time go to the customer site is definitely not just go blindly the company's products, the strength, the margin of preference a single topic, but at the same time points including the center room placement do understand a customer's live webcam as well as on the walls infrared alarm installation, referred to here is understood, not simply remember the need to probe in the future need to point device, but to note down from the engine room to a monitoring point between the lines in the alignment will the actual construction is easy or complex, common on-site construction complex situations are caused by ill-considered pre- Mainly reflected in:

The line can not go;
The threaded shaft is blocked can not be threaded;
The bridge within the strong current of 380 volt (professional technicians are clear and the 380V strong electric How serious is the use of surveillance cameras video line interference);
Point A to point B between the sections must be cut pavement;
Monitor and alarm system installation location is interference, whether mine, and what kind of bracket;
Burglar alarm system is a sub-line or bus type;
The installation location is too high or there are other factors lead to non-fat installation.
 
These circumstances listed above occur in the general project, if we can while these eleven understanding to negotiate, I believe that the interests of Security Contractors to maximize the assurance, but also allow the Party felt he find Contractors is a professional.

After the win of the project, while construction equipment into the factory, the best do not rush to immediately open the video cable, power cord so he took a tool to work, but should first get all the lines the path to rationalize such will not appear on the construction of half of the time, stop and do other work. Can also reveal a trick to install PTZ or high-speed ball, speed ball, can control the front-end equipment, the power cord can be separated with the color of the line of control, take the black with a white two midline, so that the final commissioning eliminating the need can not find which line is the power cord or line of control of the ball machine to the amount of holding the multimeter off the embarrassment.

Lines had been in place, the camera in accordance with the monitoring points to the area to monitor in the most remote, and depends on the perspective of matching suitable for the monitoring probe, the common effect of a good distance distribution should be 5-10 m using 3.6MM Lens 15-30 meters using 6mm lens, 30 -50 meters in area 8-12-16 3 files lens. Installation location where the high-speed ball need to consider when installing is to monitor the regional environment allows the ball machine intelligence to maximize the reflected, to install the smart ball often encountered obstacles in the room, under such circumstances can be used the lifting of the construction, which allows the ball machine down looking down from above to avoid open block objects. Believe these details work carefully to deal with, and ultimately the DVR displayed image will make customers feel very satisfied.

Monitoring systems, and other anti-theft system after the installation is completed, should not be the end of the project. Professional practice to each point from the engine room to check again, remove the device with or without hidden faults, excluded this period is the installation location is waterproof, mine, construction, equipment installation, etc.. Do not read this step, which is real for you in the future to reduce system maintenance. This is also a fast no small expenditure.

All rights reserved; Weide Kang Science and Technology Development Co., Ltd., Shenzhen City, Guangdong ICP 000000 Postcode: 518000 Tel:0755-25321958
Unified national customer service hotline :400-6828185 Fax: 0755-25321959 three the third floor of the East Technical support: Divine Mastery Network